New Adopted Codes & Flat Rate Fees
-
-
Effective October 5, 2007
On September 5, 2007 the Maricopa County Board of Supervisors voted unanimously to :
Adopt amendments to the Planning and Development Local Additions and addenda to adopt the following building codes with AZBO/MAG amendments.
-
Plans may be submitted under the new or old codes until January 1,2008. After January 1, 2008 all plans must comply with these new codes.
- 2006 International Building Code
- 2006 International Residential Code
- 2006 International Mechanical Code
- 2005 National Electrical Code
-
-
Also adopted by the Board of Supervisors with an effective date of January 19, 2008:
- 2006 International Plumbing Code
All plans submitted after January 19, 2008 must also reference the 2006 International Plumbing Code
-
-
Please call (602) 506-7147 for additional information.
-
-
New Flat Rate Fees: Effective - October 5,2007
-
-
Air conditioner $ 50
Elec. Serv Residential 1 – 200 amps $ 50
Elec. Serv Res or Comm 201 – 400 amps $ 75
Elec. Serv Over 400 amps $120
Temporary meter $ 50
Evaporative cooler $ 50
Gas Line (connect or clearance) $ 50
Mobile home “Pre-HUD Upgrade” $ 50
Plumbing sewer line SFR $ 50
Irrigation System $ 50
Sprinkler $ 50
Mechanical $ 50
Plumbing (Install or replace Equip/fixture/devices) $ 50
Demolition Permit $ 50
Manufactured/Mobile Home Setup/Installation $ 200
Commercial Manufactured Building (factory built building) Based on installation value & Table 1-A
Occupancy Change $ 75
Hot tub or Spa (in or above ground) $ 75
Swimming pool above ground $ 75
Compliance Inspection $100
Move on House (compliance inspection $100
Renew permit for final $100
Special Event Fee (tents) $100 per event
|