Stormwater Pre-Construction Phase
|
Fee
|
|
Pre-Construction Plan Review
|
$1050.00
|
|
Pre-Construction Site Inspection
|
$325.00
|
|
One Additional Review of Pre-Construction plans with minor revisions and One Inspection of the Site Revisions
|
$670.00
|
|
Re-Inspection of site when corrections to the site have been made following a failed initial site inspection
|
$325.00
|
|
Expedited plan reviews and inspections are available at twice the standard fee
|
Double Fee
|
|
Note: Applicant will have to re-apply for the pre-construction plan review if the revised plan or site inspection resulting from a revision or re-inspection of the site fails to get approval by the Department.
|
|
Stormwater Post-Construction Phase
|
Fee
|
|
Post-Construction Plan Review
|
$1050.00
|
|
Post-Construction Site Inspection
|
$325.00
|
|
One Additional Review of Post-Construction plans with minor revisions and One Inspection of the Site Revisions
|
$670.00
|
|
Re-Inspection of site when corrections to the site have been made following a failed initial site inspection
|
$325.00
|
|
Expedited plan reviews and inspections are available at twice the standard fee
|
Double Fee
|
|
Note: Applicant will have to re-apply for the post-construction permit if the revised plan or site inspection resulting from a revision or re-inspection of the site fails to get approval by the Department.
|
|
Miscellaneous
|
Fee
|
|
Inspections by request
|
$325.00
|
|
Waivers
|
Fee
|
|
Fee includes document reviews and site inspection
|
$2425.00
|
|
Permit Transfers
|
Fee
|
|
The fees presented are for permits and permit related activity approvals issued to a newly listed owner-operator of the site.
|
$200.00
|
|
Refunds
|
|